Tower 2 Southern Wing: Those Jokers Tried To Paint The External Wall From The Master Bedroom Window. Now Let's Wait & See How They Finish The Painting The Wall
All future comments and discussions here:
Thursday, September 17, 2009
Wednesday, September 16, 2009
Extension Of LRT Lines
This is a follow up to my earlier posting some time back here: -
http://sierraresidency.blogspot.com/2007/04/lrt-at-bandar-kinrara.html
I was at MPSJ this morning and noticed that Prasarana had set up a booth to display the proposed extension and alignment of the two LRT lines, one of which would pass through Bandar Kinrara. There will be 3 proposed stations at Bandar Kinrara, at BK 2 / BK5A, at BK3 / Taman Perindustrian Kinrara and at BK9 / Taman Industri Bukit Kinrara. This is very good news indeed.
The booth will be there for 3 months until 14 December 2009 for public viewing and comments. The following were photos taken at the booth: -
The Futuristic Design Of The Proposed LRT Stations.
News here: -
http://thestar.com.my/metro/story.asp?file=/2009/9/15/central/4713199&sec=central
http://sierraresidency.blogspot.com/2007/04/lrt-at-bandar-kinrara.html
I was at MPSJ this morning and noticed that Prasarana had set up a booth to display the proposed extension and alignment of the two LRT lines, one of which would pass through Bandar Kinrara. There will be 3 proposed stations at Bandar Kinrara, at BK 2 / BK5A, at BK3 / Taman Perindustrian Kinrara and at BK9 / Taman Industri Bukit Kinrara. This is very good news indeed.
The booth will be there for 3 months until 14 December 2009 for public viewing and comments. The following were photos taken at the booth: -
The Futuristic Design Of The Proposed LRT Stations.
News here: -
http://thestar.com.my/metro/story.asp?file=/2009/9/15/central/4713199&sec=central
Subscribe to:
Posts (Atom)