Tuesday, August 19, 2008

Site Photos 10 August 2008

The following site photos were taken on 10 August 2008, do not have time to post them till now...

View Of Entire Project Site

Tower 1, Painting Works Continuing

Tower 2, Structure And Brick Works Progressing

Tower 1, The Side Facing The Hill Is Also Being Painted, Wonder Why The Wall & Window To The Master Bedroom For The Corner Unit Is Not Done Yet.

Tower 2, The Side Facing The Back Is Also Up To 5th Floor

Thursday, July 31, 2008

Site Photos 31 July 2008

Seems that all works are concentrated on Tower 2, which is a good thing as the handover date is the same. At least there won't be anymore progress claim for Tower 1 until they do the sewerage, road and drainage works.


Tower 1, They Are Finishing Off The Top Most Units And The Roof For Lift Lobby

Tower 1, I Noticed That They Are Using 3 Different Colours For The External Walls At The Living Areas, Looks Rather Funny I Think

Tower 2, Construction Works Catching Up Fast!

Tower 2, Structure Up To 5th Floor And Followed By Brick Walls And Window Frames At 1st Floor

View Of Both Towers From Taman Puncak Kinrara At The Back

Monday, July 14, 2008

Site Photos 11 July 2008

Works on site is progressing well, actually I hope it could be faster. Well at least Tower 2 is coming up. More exciting times ahead for Tower 2 purchasers...

Tower 2 coming up, one more floor and the northern wing of Tower 1 will be covered.

Tower 1, southern wing not much activities except the glass panels for unit A01-09 had been installed.

The topping up of Tower 1, well not really, still have the roof slab for those units at Level 11 to go.

Tower 2 southern wing up to third floor now :)

Tower 2 northern wing also catching up with its southern wing.

Tuesday, June 17, 2008

Site Photos 17 June 2008

Well, well, well after concentrating on the interior for a while , it's time to check out the progress of the entire project. As can be seen the works have progress quite a bit :)
Entire Project Site, Glad To See Tower 2 Progressing

Tower 2, RC Works Now Up To 2nd Floor

Tower 1 Southern Wing Completed, Northern Wing Works Now Up To 10th Floor

Tower 1, They Have Painted A Different Shade To The External Of The Living Room, But I Think It Is Still Very Far From The Model & Perspectives

Tower 1 Northern Wing Now Up To 10th Floor, Only One More Floor To Go!

Thursday, June 5, 2008

Photos Of Common Areas

It's been a rather depressing day with the fuel increased and all, but hope the following photos would provide some cheers to everyone.

Lift Lobby

Lift Lobby with Apartment Unit Behind

Common Corridor

Air Well Next to the Common Corridor

Staircase Toward the End of the Building

Monday, May 12, 2008

Site Photos 05 May 2008 Part 2

Here are some more photos of the Wardrobe, Bathrooms, Dining and Kitchen that were missing in the earlier posting. I am sure TEC is a happy man now...

Walk In Wardrobe: This Feature Actually Reduced The Size Of The Master Bathroom

Master Bathroom: The Shower Is Smaller Due The Boxed Up Of The Pipes On The Left

Shower Area For Bathroom 1, It Is Good That They Provide The Kerb, We Can Just Add A Shower Screen or Shower Curtain Later

Bathroom 2 Is Much Bigger And Also Comes With The Kerb

Kitchen: Hated The Splayed Corner... Wasting Space Only! I Would Have Prefered The Same Type Of Floor Tiles As The Dining & Living

Dining And Entrance To The Apartment Unit

Tuesday, May 6, 2008

Site Photos 05 May 2008

Latest update of the progress of works on site!

This time it is about the interior of the apartment units. Most of the units at the Southern wing of Tower 1 had been tiled whereas in some of these units, tiling works are still in progress. Below are some photos: -

Living Hall: Floor Tiles Completed, Wonder If They Will Provide Skirting? It Will Definitely Be Nicer.

Master Bedroom: Floor Tiled Completed Are Of The Same Type (450 mm x 450 mm) As The Living Hall

Bedroom 2: Floor Tiles Completed But Of A Smaller Sized (300 mm x 300 mm)

Bedroom 3: Floor Tiles Completed Also Of A Smaller Sized (300 mm x 300 mm)

Door To Bedroom 2: This Is What You Get If You Used A Different Sized Tiles For The Corridor And Bedroom 2 and 3

Yard: This Ugly Mess Of Pipes Is Visible In The Yard. Hope They Will Boxed Them Up

Cannot Access The Sample Unit As The Door Was Locked! The Door Looks Nice Though!

Tower 2, Well From The Top We Can See That The First Floor Slab Is Still Progressing