Site Photos 05 May 2008

Latest update of the progress of works on site!

This time it is about the interior of the apartment units. Most of the units at the Southern wing of Tower 1 had been tiled whereas in some of these units, tiling works are still in progress. Below are some photos: -

Living Hall: Floor Tiles Completed, Wonder If They Will Provide Skirting? It Will Definitely Be Nicer.

Master Bedroom: Floor Tiled Completed Are Of The Same Type (450 mm x 450 mm) As The Living Hall

Bedroom 2: Floor Tiles Completed But Of A Smaller Sized (300 mm x 300 mm)

Bedroom 3: Floor Tiles Completed Also Of A Smaller Sized (300 mm x 300 mm)

Door To Bedroom 2: This Is What You Get If You Used A Different Sized Tiles For The Corridor And Bedroom 2 and 3

Yard: This Ugly Mess Of Pipes Is Visible In The Yard. Hope They Will Boxed Them Up

Cannot Access The Sample Unit As The Door Was Locked! The Door Looks Nice Though!

Tower 2, Well From The Top We Can See That The First Floor Slab Is Still Progressing

6 comments:

Anonymous said...

Heard from friend of mine who bought a unit of apartment in USJ that it is a trend these days that developer not providing skirting anymore!

Anonymous said...

Drain pipe at the yard, i don't think they will box it up! Do you?

Anonymous said...

They will try to save on whatever they can, but I have also seen apartments with ceramic tiles using timber skirting which I felt also seems OK. Better than nothing

Well it is just hopeful thinking that they will box the pipes up, don't think they will do it!

Anonymous said...

i think u r right cel...the pipe shouldn't be design in such a way at the first place....

Anonymous said...

if they box it also, the whole yard will become ugly, because the cover will be obvious....

Unknown said...

can someone tell me when the whole project finish? around 2009 is it? cannot wait to move in la...got so many plan oredi :)