Thursday, June 5, 2008

Photos Of Common Areas

It's been a rather depressing day with the fuel increased and all, but hope the following photos would provide some cheers to everyone.

Lift Lobby

Lift Lobby with Apartment Unit Behind

Common Corridor

Air Well Next to the Common Corridor

Staircase Toward the End of the Building

Monday, May 12, 2008

Site Photos 05 May 2008 Part 2

Here are some more photos of the Wardrobe, Bathrooms, Dining and Kitchen that were missing in the earlier posting. I am sure TEC is a happy man now...

Walk In Wardrobe: This Feature Actually Reduced The Size Of The Master Bathroom

Master Bathroom: The Shower Is Smaller Due The Boxed Up Of The Pipes On The Left

Shower Area For Bathroom 1, It Is Good That They Provide The Kerb, We Can Just Add A Shower Screen or Shower Curtain Later

Bathroom 2 Is Much Bigger And Also Comes With The Kerb

Kitchen: Hated The Splayed Corner... Wasting Space Only! I Would Have Prefered The Same Type Of Floor Tiles As The Dining & Living

Dining And Entrance To The Apartment Unit

Tuesday, May 6, 2008

Site Photos 05 May 2008

Latest update of the progress of works on site!

This time it is about the interior of the apartment units. Most of the units at the Southern wing of Tower 1 had been tiled whereas in some of these units, tiling works are still in progress. Below are some photos: -

Living Hall: Floor Tiles Completed, Wonder If They Will Provide Skirting? It Will Definitely Be Nicer.

Master Bedroom: Floor Tiled Completed Are Of The Same Type (450 mm x 450 mm) As The Living Hall

Bedroom 2: Floor Tiles Completed But Of A Smaller Sized (300 mm x 300 mm)

Bedroom 3: Floor Tiles Completed Also Of A Smaller Sized (300 mm x 300 mm)

Door To Bedroom 2: This Is What You Get If You Used A Different Sized Tiles For The Corridor And Bedroom 2 and 3

Yard: This Ugly Mess Of Pipes Is Visible In The Yard. Hope They Will Boxed Them Up

Cannot Access The Sample Unit As The Door Was Locked! The Door Looks Nice Though!

Tower 2, Well From The Top We Can See That The First Floor Slab Is Still Progressing

Wednesday, April 23, 2008

Site Photos 19 April 2008

As Max said, its been quite sometime since the last updates. The following photos were taken on 19-04-2008. Well the first photo below is dedicated to Max as you can see his unit A07-07... our friend here too eager to pay money...

Tower 1 Progressing Nicely : )

Tower 2, Still At First Floor, Now Casting Floor Slab For Northern Wing


Tower 1, Southern Wing Up To Roof, Northern Wing Up To Level 7
Max Should Be Jumping For Joy : )

Based Coat Painting For A Portion Of Tower 1 In Progress

Tuesday, March 25, 2008

Site Photos 25 March 2008

More progress site photos . They have commenced external plastering works for the southern wing of Tower 1, for those units facing the pool/playground. So owners of those units prepare to pay more interest as the bank will be releasing the next 10% very soon!
Tower 1, External Plastering Works Commenced

Tower 1

Tower 1

Tower 1, I noticed that they have made some changes to the external walls for the right hand section of this facade. If you look at the photos of the Artist Impression & Scaled Model, there were white fins/hood for all units No. 12. I felt that by doing that they had compromise the look of the building, not to mention cheaper and easier for them to construct.

Tower 2, southern wing 1st floor slab casted.

Monday, March 17, 2008

Site Photos 17 March 2008

Fellow purchaser Daryl Teo had posted some progress site photos at the following link: -

http://www.msnusers.com/SierraResidency/shoebox.msnw?Page=1

There are photos of the common corridor of the apartment which is well lit, this very good indeed. You can also checkout photos of the Wash Area and Bathrooms.

Unfortunately Daryl had deleted the above link!

Friday, March 14, 2008

Site Photos 13 March 2008

The following photos were taken yesterday evening. Works are progressing reasonably well.

Tower 1 Progressing Well, Window Frames Are All Up Except For 7th Floor

Tower 2 Comming Up, Basements Levels And Ground Floor Up And Should See Apartment Units Coming Up Next Month.

Scafoldings Are Being Erected Around Tower 1, I Think They Are Commencing External Plastering For This Tower Soon.